Back to blog
February 19, 2026•
Old Home Plumbing Remodel During A Restorationrenovationplumbingcontractorsbest-practices

Old Home Plumbing Remodel During a Restoration Guide

Plan and execute an old home plumbing remodel during a restoration. Simple steps, code checks, material choices, timelines, and pricing tips for contractors.

Old Home Plumbing Remodel During a Restoration Guide

Introduction

On most restorations, the plumbing is the wildcard. Walls hide leaks, vents are missing, and galvanized pipe flakes shut. An Old Home Plumbing Remodel During A Restoration needs a clear plan. In this guide, you’ll see how to survey, choose materials, phase the work, and pass inspections. We’ll talk safe demo, rough-in steps, water quality fixes, and finish testing. Use these steps to avoid call-backs, protect margins, and keep the schedule tight.

Quick Answer

An Old Home Plumbing Remodel During A Restoration works best with a tight scope, safe demo, and a staged rough-in. Replace failing supply and drain lines, correct venting, add pressure control, and test for 2 hours before close-up. Use 3/4-inch mains, 1/2-inch branches, 1/4 inch per foot drain slope, and 60–75 PSI house pressure.

Table of Contents

  • Key Takeaways
  • Old Home Plumbing Remodel During A Restoration: Scope And Survey
  • Code, Permits, And Historic Constraints
  • Safe Demo, Temporary Water, And Protection
  • Old Home Plumbing Remodel During A Restoration: Rough-In Plan
  • Pressure, Flow, And Water Quality Upgrades
  • Old Home Plumbing Remodel During A Restoration: Testing, Finish, And Handover
  • FAQ
  • Conclusion

Key Takeaways

  • Survey first: map every fixture, line, and vent before you cut.
  • Replace problem materials: galvanized, lead bends, drum traps, and corroded cast iron.
  • Control pressure and flow: aim for 60–75 PSI and 2–5 gpm at key fixtures.
  • Test long: 2-hour water test on supply and 10–15 minutes per floor on drains.
  • Document hidden conditions fast to approve change orders and avoid delays.

Old Home Plumbing Remodel During A Restoration: Scope And Survey

A good Old Home Plumbing Remodel During A Restoration starts with a tight survey.

  1. Walk-Through (60–90 minutes)

    • List every fixture by floor. Note heights and clearances.
    • Check for S-traps, drum traps, and unvented fixtures.
    • Look for bell-and-spigot cast iron with failed lead/oakum joints.
  2. Supply Check

    • Galvanized steel? Plan to replace. Flow loss is common after 40–60 years.
    • Note sizes: 3/4-inch mains, 1/2-inch branches, and 1-inch service where needed.
    • Check water heater capacity (40–50 gal tank or 150–199k BTU tankless).
  3. Waste/Vent Mapping

    • Confirm 1/4 inch per foot slope on horizontal drains.
    • Identify vent terminations. No vents? Plan wet vent or new vents per code.
  4. Hazards

    • Lead service lines, lead solder (pre-1986), and asbestos wrap. Flag for abatement.

Tip: Sketch as you go. Photos from floor to ceiling save hours later. For contractors handling proposals, creating professional proposals pairs well with understanding project timelines and change orders.

Code, Permits, And Historic Constraints

Restorations often sit in historic districts. That changes how you work.

  • Permits and Inspections

    • Get plumbing and mechanical permits before demo.
    • Expect 2–3 inspections: rough-in, insulation/firestop, and final.
  • Structural Limits

    • Don’t notch or bore past local code. Commonly: bore ≤ 1/3 joist depth, notch ≤ 1/6 span zone. When unsure, ask the inspector.
  • Historic Rules

    • You may need to keep plaster in select rooms. Plan “surgical” openings.
    • Keep existing fixture locations when walls can’t move. Use offset drains and flexible supplies to hit old lines.
  • Fire, Sound, and Health

    • Firestop every penetration. Use listed sealants and collars.
    • Cast iron for stacks reduces noise versus PVC.
    • Anti-scald mixing valves set to 120°F. Many inspectors look for this.

Safe Demo, Temporary Water, And Protection

Old houses fight back. Keep the site safe and livable.

  1. Temporary Water (1–2 hours)

    • Cap and keep one hose bib live for cleanup.
    • If the home is occupied, set up a temporary sink and toilet for 48–72 hours.
  2. Controlled Demo

    • Drain lines before cutting. Use shielded couplings on cast iron transitions.
    • Cut small windows in plaster first to find chases and stacked lines.
  3. Protection

    • Cover floors and stairs. Heavy tubs and old radiators crack wood fast.
    • Use HEPA vacs when cutting to limit dust.
  4. Documentation

    • Photograph hidden defects: rotten sills, off-slope lines, illegal vents.
    • Log time and materials by area. This speeds up change order approval. Tools like Donizo help you capture site photos and voice notes, then turn them into a clean proposal with e-signature.

Old Home Plumbing Remodel During A Restoration: Rough-In Plan

Now you build the backbone that lasts 50+ years.

  1. Water Supply

    • Main: 1-inch service where pressure is weak; 3/4-inch interior main typical.
    • Branches: 1/2-inch to most fixtures; 3/4-inch to tubs and multi-head showers.
    • Materials: PEX-A with expansion, Type L copper, or a mix. Use dielectric unions on copper-to-steel transitions.
  2. Drains and Vents

    • Slope: 1/4 inch per foot on ≤ 3-inch lines; 1/8 inch per foot on larger (if allowed by code).
    • Replace drum traps with P-traps. Eliminate S-traps.
    • Add vents. Wet venting is fine if sized per code. Keep trap arm lengths short (often ≤ 5 feet for 1-1/2-inch arms—verify locally).
  3. Stacks and Transitions

    • Cast iron no-hub with shielded couplings for quiet stacks.
    • PVC or ABS for branch drains where noise is not critical.
    • Use listed transition couplings for cast iron to PVC. No plain rubber sleeves.
  4. Fixture Placement

    • Toilets: 12-inch rough from finished wall is standard. Check old 10-inch rough bowls.
    • Showers: Aim for 2.0–2.5 gpm heads. Confirm drain size (2-inch typical).
    • Tubs: Heavier cast iron needs blocking. Plan for 1-1/2-inch or 2-inch drains per code.
  5. Testing During Rough

    • Water lines: Many inspectors require a 2-hour water test at or above working pressure. Ask first.
    • Drains: Ball test or water stack for 10–15 minutes per floor.

Pressure, Flow, And Water Quality Upgrades

A clean Old Home Plumbing Remodel During A Restoration improves comfort and safety.

  • Pressure and Expansion

    • Aim for 60–75 PSI at fixtures. Add a PRV if house pressure is 80 PSI or more.
    • Add an expansion tank on closed systems, sized to the heater (e.g., 40–50 gal tank).
  • Hot Water Delivery

    • Consider a recirc line on long runs over 60 feet. Use timers or demand pumps.
    • Set water heater to 120°F at the tap. For tankless, confirm minimum flow to fire (often 0.5–0.8 gpm).
  • Water Quality

    • Flush brown water from old galvanized. Sediment filters (5–20 microns) help.
    • If lead is present, replace the service. Point-of-use filters are a stopgap only.
  • Freeze and Condensation

    • Insulate exposed pipes (R-3 to R-6). Keep lines away from exterior walls when possible.
    • Slope condensate and relief lines to safe drains. No floor pooling.

If you price work by phases, this pairs well with clear change orders. For contractors dealing with change orders, we recommend linking to a practical change order checklist so clients sign fast and work keeps moving.

Old Home Plumbing Remodel During A Restoration: Testing, Finish, And Handover

The last 10% prevents call-backs.

  1. Pre-Close Testing (1–2 days)

    • Pressure test all supplies for 2 hours. Fix even tiny leaks now.
    • Fill tubs and sinks, then drain while someone checks below for drips.
  2. Finish Set

    • Install trim, valves, traps, and escutcheons. Use silicone sparingly and neatly.
    • Caulk tubs and showers after 24 hours dry time.
  3. Final Checks

    • Measure flow at key fixtures (2–5 gpm typical). Verify hot at 120°F.
    • Check GFCI near sinks and leak alarms where clients want them.
  4. Handover

    • Give shutoff locations, filter change steps, and warranty info.
    • Convert notes and approvals into a final invoice. Platforms such as Donizo let you turn accepted proposals into invoices in one click, which keeps cash flow smooth.

FAQ

Do I need to replace all galvanized pipes?

Usually yes. Galvanized steel builds rust inside and chokes flow. In general, once you open walls, it’s cheaper long-term to replace all galvanized with PEX-A or copper. You’ll avoid future leaks and callbacks.

Can I keep the old cast iron stack?

Often you can keep straight, solid sections. Replace cracked hubs, corroded tees, and leaking joints. Use no-hub cast iron with shielded couplings for quiet. If the stack is pitted or patched, replace it end-to-end.

How long does an old home plumbing remodel take?

Commonly, 2–4 weeks for full rough-in on a typical 2-bath home, plus 2–5 days for trim and testing. If you hit hidden issues (rot, asbestos, lead), add 3–10 days for abatement and framing repairs.

What pressure should I aim for after the remodel?

Most homes feel right at 60–75 PSI. If the street pressure is over 80 PSI, install a pressure-reducing valve and an expansion tank. High pressure causes noisy pipes and shortens fixture life.

Are air tests allowed on water lines?

Many areas don’t allow air tests on potable lines for safety. Ask your inspector. Water tests for 2 hours at or above working pressure are common, and safer.

Conclusion

An Old Home Plumbing Remodel During A Restoration is all about clear surveys, safe demo, sized lines, proper venting, and long tests. Do these steps and you’ll protect profit and pass inspections the first time. Next steps: 1) Map every line and hazard, 2) Write a phased scope with unit pricing, 3) Test before close-up. If you want faster approvals and smoother billing, capture details and send branded proposals with tools like Donizo. Keep it tight, document everything, and you’ll finish strong on every restoration.

Contractors using Donizo

Ditch the paperwork and reclaim your time with Donizo.

Contractors across Europe trust Donizo to handle their quotes and invoices while they focus on what they do best: their craft.

Use Donizo for FreeBook a Demo with us

Related Articles

Discover more insights and tips for your construction business

Do You Go Above and Beyond Like This? Contractor Playbook
February 19, 2026•
contractorscustomer-experience

Do You Go Above and Beyond Like This? Contractor Playbook

A simple, practical playbook to go above and beyond on every job. Win trust, reduce callbacks, and turn clients into referrals without burning hours.

Concrete Sealer Spray Process: Make Walls Look New
February 18, 2026•
concrete sealer spray processconcrete

Concrete Sealer Spray Process: Make Walls Look New

Learn a proven concrete sealer spray process that cleans, preps, and seals walls so they look brand new. Clear steps, tools, specs, and pro tips.

First Day of Work for Home Renovation Contractors
February 17, 2026•
home-renovationcontractors

First Day of Work for Home Renovation Contractors

Run a clean, safe, and client-friendly first day. Use this simple checklist to set expectations, protect the home, and start the job right.

Building a Charging Station for Your Shop
February 17, 2026•
building a charging station for my shopshop

Building a Charging Station for Your Shop

Practical, step-by-step guide to build a safe, organized shop charging station for tool batteries. Clear plans, power tips, materials list, and safety must-dos.

Come Find a Leak: Contractor’s Field Guide
February 17, 2026•
come find a leakleak detection

Come Find a Leak: Contractor’s Field Guide

A simple, field-tested process to come find a leak fast. Tools, steps, pricing, and reporting tips contractors can use on plumbing, slabs, and roofs.

Les étapes pour installer une lave-vaisselle: Pro Guide
February 15, 2026•
installationplumbing

Les étapes pour installer une lave-vaisselle: Pro Guide

A clear, step-by-step dishwasher install guide with measurements, code tips, and testing steps contractors can use to finish cleanly on the first visit.

View all articles